Commercial
site work is a part of a construction project and is not a part of a building
or house’s physical structure. Usually, site work includes some outdoor type
work. You can contact the Ocala
home builders for your commercial site work. They can help you to complete
the job of your site work efficiently.
Typically,
site work and preparation means the following sections.
1.
Development of the structure’s foundation through excavation or land clearing.
2. Rough or
initial grading.
3. Final
grading.
4.
Landscaping.
5.
Construction and paving of driveways.
6. Concrete
curbing and sidewalks or walkways.
7.
Preparation and approval of permits and fees.
8. Septic
and sewer systems.
9. Well or
water.
10. All
dirt-moving activities, including excavation and compaction.
11.
Sanitary, storm, and water utility installation.
12. Building
pad installation and many others.
Now, let's
discuss some of the essential services in detail and the amount of cost that
you need to spend.
1. Site Stripping
It is a kind
of stockpiling any material which has organic matter from the construction
site. In this service, prices vary widely depending on the amount of element
that you want to move. It's also depended on the hauling distance and the site
conditions at the time of moving to stockpile on the site. The cost range is
between $2.00 and $5.00 per cubic yard for this process.
2. Grading
This is one
of the most vital tasks for a commercial site design project. Day by day, it is
made easier with the machine control. You may need to spend around $0.50 to
$1.00 per square yard for this procedure.
3. Land clearing
It is
probably the first step in making a site ready for the construction work to
kick off. This project includes cutting down trees and shrubs on the land where
the building is going to take place. Also, it may entail the demolition of old
structures and the removal of other obstructive objects.
The cost of
land clearing may vary depending on its complexity and the scope of the clearance
to be done. Most of the commercial site work companies will charge between
$5,000 and $11,000 per acre for this service.
4. Installing utilities
The
installation cost of this service can widely vary depending on the size of the
material, depth, and the type of pipe that is going to be installed. That's why
it's difficult to give an accurate cost range for this service. But you should
expect to spend ranges between $20 and $120 per linear foot.
5. Spreading the topsoil over the
green areas
This
commercial site work service helps in creating a level lawn and giving more
nutrition sources. Covering the topsoil service can cost between $60.00 -
$70.00 per cubic yard to import.
Like all the
other services, it also depends on how much work input is needed and how far
the materials require to be transported. You may expect to pay anywhere between
$3.00 and $5.00 per yard if there stockpiled topsoil on site is used.